Categories

A sample text widget

Etiam pulvinar consectetur dolor sed malesuada. Ut convallis euismod dolor nec pretium. Nunc ut tristique massa.

Nam sodales mi vitae dolor ullamcorper et vulputate enim accumsan. Morbi orci magna, tincidunt vitae molestie nec, molestie at mi. Nulla nulla lorem, suscipit in posuere in, interdum non magna.

Testing start Process – Operation and Maintenance

Testing start process has got 4 main phases namely: – Requirements analysis – Design – Programming and construction – Operation and maintenance

In this article we shall see the fourth phase i.e., the operation and maintenance phase in detail.

1. Making changes to the program under testing is a frequent thing in the development […]

Testing start process – Programming and Construction

Testing start process has got 4 main phases namely: – Requirements analysis – Design – Programming and construction – Operation and maintenance

Here, we shall concentrate up on the third phase i.e., the programming and construction phase. 1. This phase takes a lot of time for testing. 2. The whole code written for the program […]

Testing start process – Design Phase

Testing start process revolves around the development process of a software product or the system. Though testing is not counted as a separate phase in the SDLC or software development life cycle but it is a critical and inseparable part of the whole development process. Testing start process is carried out at the end of […]